EXPERTDistributed Systemssoftware architect

Design a Large-Scale System Migration

Design a strategy to migrate a monolithic system serving 10M users to microservices with zero downtime.

Estimated Time: 60 minutes
#migration#monolith#microservices#strangler-fig#architecture
Solution Overview

Use Strangler Fig pattern, implement feature flags, parallel running, and gradual traffic shifting.

Hints to Get Started
1

How do you maintain feature velocity during migration?

2

Consider data consistency challenges

3

Think about team capacity and skills

Phases

3 migration

Extract services incrementally

2 foundation

Build platform, CI/CD, observability

1 preparation

Inventory, documentation, team training

4 optimization

Decommission legacy, optimize new system

Context

Large-scale migrations require careful planning, risk mitigation, and organizational alignment.

Data Migration

cutover

Final sync window, minimize duration

strategies

  • Dual-write
  • CDC (Change Data Capture)
  • Batch + catch-up

consistency

Verify data integrity at each step

Risk Mitigation

feature flags

Control rollout percentage per feature

rollback plan

Every change must be reversible

circuit breakers

Automatic fallback to old system

parallel running

Run old and new systems, compare results

Success Metrics

business

  • Feature velocity
  • Incident rate
  • Developer satisfaction

technical

  • Error rate comparison
  • Latency comparison
  • Resource utilization
Migration Patterns

strangler fig

steps

  • Identify bounded contexts
  • Build new service
  • Route traffic gradually
  • Decommission old code

description

Incrementally replace parts of the system

branch by abstraction

use case

Database migrations, library replacements

description

Create abstraction layer, swap implementations

Organizational Aspects

timeline

Be realistic, plan for unknowns

communication

Regular updates to stakeholders, clear milestones

team structure

Dedicated migration team or distributed ownership